Lamèque Wind Farm

Connected to the grid in 2011, the Lamèque wind farm, with its 30 wind turbines, avoids some 148,000 tons of CO2 emissions per year from coal-fired power plants.

Grid connected in 2011, Lamèque was the first wind farm installed by the company in Canada with ACCIONA Windpower wind turbines. It consists of thirty AW1500 turbines that produce clean energy to cover the electricity demand of around 8,000 homes in the area. It is located on the island of the same name, on the country’s Atlantic coast.

GENERAL INFORMATION

  • Location: Lamèque Island, Gloucester County, New Brunswick. Canada.
  • Capacity: 45 MW.
  • Wind turbine: ACCIONA Windpower AW77/1500.
  • Tower: Steel,hub height 80m.
  • Start-up: 2011.
  • Owner: ACCIONA.

KEY FIGURES

  • First wind farm with ACCIONA Windpower turbines in Canada.
  • Contract awarded after a selection process organized by the utility company New Brunswick Power for the purchase of renewable energy.
  • Clean energy equivalent to the consumption of over 8,000 homes
  • Around 148,000 metric tons of CO2 emissions from coal-fired power stations avoided per year
  • Construction under harsh weather conditions
  • An example of the synergies between the business units Energy, Windpower and Infrastructure of the ACCIONA Group.

Key figures

45

megawatts (MW) of power

8.000

equivalent households

30

wind turbines

148,000

tons of CO2 into the atmosphere avoided per year

+100

jobs created during construction

33.5

million tree equivalent