This website uses proprietary and third-party cookies. By continuing to navigate this website, you are accepting the use that we make of them. If you wish, you may change your settings on your browser.

ANA (IBEX 35) +68,6600 (1,09 %)

What are you searching?

    Norway

    ACCIONA Construction obtained its first contract in Norway in 2015: the design and construction of two twin tunnels, each running for 18.5 km, as part of the Follo Line Project, which will join the cities of Oslo and Ski. The infrastructure is promoted by the Norwegian public railways administration (Jernbaneverket) and when it draws to a close, in 2021, it will be the longest railway tunnel in Scandinavia.


    Projects

    Follo Line Rail Tunnels

    Follo Line Rail Tunnels

    The EPC contract includes design and construction of two twin tunnels of 8.75-meter interior diameter, drilled using 4 TBMs. Each tunnel is 18 km long.


    Representative

    Fernando Vara

    ACCIONA Construction - Follo Line Project Director

    fernando.vara@agjv.no
    +47 23 89 69 50
    Sluttstykket E6 - Exit 26, 1291 Oslo - Norway

    Move up