General Information
- Project: WWTP Southeast
- Entity: Association of Waters of the Southeast of Gran Canaria
- Location: Agüimes, Las Palmas. Spain.
- Design flow: 12,000 m3/day
- Population: 100,000
Key points
Pre-treatment:
Large particle screens, sifting, desander, sand classifier, deoiler and influent flow metre.
Primary treatment:
Sedimentation.
Secondary treatment:
Biological treatment of active sludge with prolonged airing and elimination of nitrogen through nitrification-denitrification. O2 input / Mud recirculation / Sedimentation.
Mud treatment:
Thickener, sifting and dehydration.
Miscellaneous:
Deodorising.