We used necessary cookies for the website to function correctly, guaranteeing basic functionalities and the security of the website. In addition. Depending on your selection, we will use our own and third-party cookies to improve the functioning; preferences cookies, related to the type of browser or the region from which you access, and/or marketing cookies that allow us to analyze browsing habits. For further information, please consult our cookies policyopens in a new tab.

You can accept all cookies, configure them or reject their use bellow.

Our foundation: acciona.org Initiatives we support Our strategy Sustainable Development Goals Social development Sustainability indices Sustainable Development Alliances Technology and innovation centres Open and collaborative innovation Digital hub Innovation projects Job offers Graduates and internships Opportunities and inclusion Safety, health and well-being Training Energy Transport Water Social Cities Real Estate Financial Integrated annual report Annual accounts Results, reports & presentations Average period of payment to suppliers Ratings Share price Dividends Analyst opinions Investor calendar General Shareholders' Meeting Board of Directors and Committees Management team Share capital Annual Corporate Governance Report Director remuneration Governance rules and compliance Framework Agreement CNMV Communications Sustainable finance

Located at Barásoain (Navarra, Spain), the site has five 3-MW wind turbines of ACCIONA Windpower technology, the most powerful designed by the company.

Three of the wind turbines are mounted on steel towers and two on concrete towers. This allows us to test both materials on the same site under different wind conditions.

The heights are 92 and 95.5 meters for the steel towers and 100 meters for the concrete ones. In both cases, the rotor diameter is 116 meters.

Under construction since 2012, the start-up of the installation took place in February 2013.

Its experimental nature does not prevent it from sending a considerable amount of energy to the grid. It produces an average 34 GWh per year, equivalent to the electricity consumption of 12,000 homes.

GENERAL INFORMATION

  • Location: Barásoain, Navarra (Spain).
  • Capacity: 15 MW.
  • Wind turbine: ACCIONA Windpower AW116/3000.
  • Tower: steel (3 - 92 and 95,5m) and concrete (2 - 100m).
  • Start-up: 2013.
  • Owner: ACCIONA.

KEY FIGURES

  • The installation is used to test the AW3000 wind turbines that ACCIONA Windpower installs all over the world.
  • It allows a comparison of the performance of the wind turbine with steel and concrete towers..
  • Despite its essentially experimental nature, it produces clean energy equivalent to the consumption of 12,000 homes.