We used necessary cookies for the website to function correctly, guaranteeing basic functionalities and the security of the website. In addition. Depending on your selection, we will use our own and third-party cookies to improve the functioning; preferences cookies, related to the type of browser or the region from which you access, and/or marketing cookies that allow us to analyze browsing habits. For further information, please consult our cookies policyopens in a new tab.

You can accept all cookies, configure them or reject their use bellow.

Our foundation: acciona.org Initiatives we support Our strategy Sustainable Development Goals Social development Sustainability indices Sustainable Development Alliances Technology and innovation centres Open and collaborative innovation Digital hub Innovation projects Job offers Graduates and internships Opportunities and inclusion Safety, health and well-being Training Energy Transport Water Social Cities Real Estate Financial Integrated annual report Annual accounts Results, reports & presentations Average period of payment to suppliers Ratings Share price Dividends Analyst opinions Investor calendar General Shareholders' Meeting Board of Directors and Committees Management team Share capital Annual Corporate Governance Report Director remuneration Governance rules and compliance Framework Agreement CNMV Communications Sustainable finance

This urban road bridge in Bilbao spans over the Nervión River. It has an arch span of 148 m that was built with a cantilever design and provisional cables.

The bridge forms part of the Bilbao eastern bypass. It is an arch bridge with a prestressed concrete upper deck, 316 m long with 14 spans, the seven central spans resting on an arch with a span of 148 m and a height of 50 m. The deck is 25 m wide and has four traffic lanes with their corresponding pavements, shoulders and median. The deck is 25 m wide and accommodates four carriageways with their corresponding pavements, shoulders and median.º

The section of the arch is a tricellular box with a variable edge, which is built by successive segments of its full width and 6 m long each. The bridge was built by cantilevering the arch together with the piers and deck, provisionally triangulating the structure with braces and directing the forces towards both abutments, which are in turn anchored to the rock.

GENERAL INFORMATION

  • Location: Bilbao, Spain.
  • Contract type: Construction.
  • Infrastructure: The most significant unit, in terms of size and execution system, is an arch bridge with the following features:
    • Arch bridge with a prestressed concrete deck.
    • It is 316 m long and has 14 spans of 18, 20, 22 and 24 m each, the 7 central spans leaning on a 50 m tall, 148 m wide arch.
    • The deck has a width of 25 m and a T-beam with two 1.5-m webs.
  • Year of project completion: 1995