We used necessary cookies for the website to function correctly, guaranteeing basic functionalities and the security of the website. In addition. Depending on your selection, we will use our own and third-party cookies to improve the functioning; preferences cookies, related to the type of browser or the region from which you access, and/or marketing cookies that allow us to analyze browsing habits. For further information, please consult our cookies policy.

You can accept all cookies, configure them or reject their use bellow.

Our foundation: acciona.org Initiatives we support Our strategy Sustainable Development Goals Social development Sustainability indices Sustainable Development Alliances Technology and innovation centres Open and collaborative innovation Digital hub Innovation projects Job offers Graduates and internships Opportunities and inclusion Safety, health and well-being Training Energy Transport Water Social Cities Real Estate Financial Integrated annual report Annual accounts Results, reports & presentations Average period of payment to suppliers Ratings Share price Dividends Analyst opinions Investor calendar General Shareholders' Meeting Board of Directors and Committees Share capital Annual Corporate Governance Report Director remuneration Governance rules and compliance Framework Agreement CNMV Communications Sustainable finance

320 MW of capacity and more than 4 GWh of storage to facilitate the integration of renewable energies into the electricity system.

The La Barca pumped storage, or reversible, hydroelectric power station is a long-term energy storage project currently being developed in the municipality of Tineo, Asturias (Spain), with commissioning planned for 2036. With a maximum turbine capacity of 320 MW and a storage capacity of 4.1 GWh, it will store energy during periods of surplus and return it to the system when it is most needed. In this way, it will contribute to the integration of renewable energies and provide flexibility and stability to the electricity system, reinforcing security of supply.

The project has been awarded grid access capacity in the tender for the Narcea 400 kV Just Transition node, which seeks to drive the economic and social revitalisation of areas affected by the closure of thermal power stations.

It has also been declared a strategic energy facility by Resolution of the Council of Ministers, approved at the proposal of the Ministry for the Ecological Transition and the Demographic Challenge (MITECO).

La Barca has been planned using environmental integration criteria, prioritising conservation of the surroundings and minimisation of impact throughout all phases of the project. It also includes innovative and sustainable initiatives in environmental, economic and social management to contribute to the development of the six municipalities in the South-West Asturias Just Transition area: Allande, Cangas del Narcea, Degaña, Ibias, Salas and Tineo.

GENERAL INFORMATION

  • Planned commissioning date: 2036.
  • Rated net head: 500 m.
  • Upper lake storage capacity: 3.49 hm³.
  • Lower lake storage capacity (La Barca reservoir): 33.16 hm³.
  • Stored electricity: 4.1 GWh.
  • Maximum turbine capacity: 320 MW.
  • Turbine cycle length: 12.79 hours.
  • Technology: 2 vertical-axis reversible Francis turbine sets.
  • Underground electric substation.
  • Grid feed: 400 kV Narcea substation (Just Transition node).
  • Budget: €352 million.

HIGHLIGHTS

  • Long-term storage. Contribution of reliable capacity and flexibility to meet the needs of the electricity system at critical moments.
  • Maximisation of renewable energy integration. It will facilitate the integration of renewables into the grid and help reduce curtailment.
  • Grid stability. Provision of advanced services: aFRR, mFRR, inertia, synchronism, voltage control and black start.
  • Energy security. Reinforcement of the operation and security of supply of the Spanish and European electricity system.

PROGRESS

  • Access capacity awarded at the Narcea 400 kV Just Transition node.
  • Declared a strategic energy facility by Resolution of the Council of Ministers.
  • Concession of water requested from the Cantabrian Hydrographical Confederation.

The Project and Environmental Impact Study are currently being prepared in order to begin the administrative authorisation process. Access and connection permits for generation and demand at the 400 kV Narcea substation are also pending.