We used necessary cookies for the website to function correctly, guaranteeing basic functionalities and the security of the website. In addition. Depending on your selection, we will use our own and third-party cookies to improve the functioning; preferences cookies, related to the type of browser or the region from which you access, and/or marketing cookies that allow us to analyze browsing habits. For further information, please consult our cookies policy.

You can accept all cookies, configure them or reject their use bellow.

Our foundation: acciona.org Initiatives we support Our strategy Sustainable Development Goals Social development Sustainability indices Sustainable Development Alliances Technology and innovation centres Open and collaborative innovation Digital hub Innovation projects Job offers Graduates and internships Opportunities and inclusion Safety, health and well-being Training Energy Transport Water Social Cities Real Estate Financial Integrated annual report Annual accounts Results, reports & presentations Average period of payment to suppliers Ratings Share price Dividends Analyst opinions Investor calendar General Shareholders' Meeting Board of Directors and Committees Share capital Annual Corporate Governance Report Director remuneration Governance rules and compliance Framework Agreement CNMV Communications Sustainable finance

The I-10 Calcasieu River Bridge Replacement Project is a major transportation investment that will replace the existing 1950s-era bridge connecting Lake Charles and Westlake in Southwest Louisiana. As a critical link for regional commuters, freight, and national supply chains, the new crossing will increase capacity, improve safety, reduce congestion, and strengthen the reliability of one of the Gulf South's most important interstate corridors.

ACCIONA, as part of Calcasieu Bridge Partners, is delivering the project through a 50-year public-private partnership that includes the design, construction, financing, operation, and maintenance of the new bridge and associated infrastructure. The project includes the replacement of the existing crossing, reconstruction and widening of approximately nine kilometers of I-10, roadway and interchange improvements, and implementation of an all-electronic free-flow tolling system.

Construction requires the integration of a new high-capacity bridge and roadway infrastructure with an existing interstate corridor. The project includes three travel lanes in each direction, auxiliary lanes, full shoulders, improved approaches, service roads, ramps, and an elevated overpass at Sampson Street that will eliminate delays caused by trains crossing the roadway. The existing bridge will be removed once traffic has been transferred to the new crossing.

Once complete, the new I-10 Calcasieu River Bridge will provide a safer, more resilient interstate crossing that improves travel times, freight movement, and regional connectivity along one of the Gulf South's most important transportation corridors. Designed for long-term performance, the project combines durable infrastructure, environmentally responsible construction practices, and a 50-year public-private partnership to support continued economic growth and reliable transportation throughout Southwest Louisiana.

GENERAL PROJECT INFORMATION

  • Client: Louisiana Department of Transportation and Development (DOTD)
  • Location: Lake Charles and Westlake, Louisiana
  • Contract Type: Design, Build, Finance, Operate and Maintain (DBFOM)
  • Total Capital Expenditure: Approximately US$2.3 billion
  • Project Team: Calcasieu Bridge Partners – ACCIONA, Plenary Americas, and Sacyr
  • Project Status: Under Construction

PROJECT SCOPE

  • Replacement of the existing Calcasieu River Bridge with a new high-capacity interstate crossing
  • Reconstruction and widening of approximately 5.5 miles of the I-10 corridor
  • Six travel lanes plus auxiliary lanes and full shoulders
  • Roadway, ramp, service road, and interchange improvements along the project corridor
  • Elevated Sampson Street overpass to eliminate train-related traffic delays
  • All-electronic free-flow tolling system and long-term operation and maintenance under a 50-year concesión

INNOVATION & SUSTAINABILITY

The project incorporates modern bridge and roadway design to improve capacity, safety, durability, and long-term resilience along one of Louisiana's most heavily traveled transportation corridors. All-electronic free-flow tolling will allow traffic to move without stopping at toll facilities, while improved grades, shoulders, roadway connections, and interchange infrastructure will enhance overall corridor performance.

Environmental considerations are incorporated into the design and construction approach to minimize impacts on the Lake Charles area. The project also combines public and private financing within a long-term P3 structure, aligning the design, construction, operation, and maintenance of the asset over its 50-year concession and supporting long-term performance and resilience.

AWARDS & RECOGNITION

  • North America Roads Deal of the Year — Proximo, 2025
  • Transport Deal of the Year — IJGlobal, 2025
  • Deal of the Year, P3 Financing — The Bond Buyer, 2024
  • PFI P3 Deal of the Year — Project Finance International, 2024
Discover all of our projects