4.1M

Liters/day

Design, construction, operation and maintenance

ACCIONA and BMD have been selected by TasWater as the preferred bidder for the design and construction to the existing Blacksman Bay Sewage Treatment Plant

The existing sewage treatment plant has been operating for 30 years and is at its end of its service life. An upgrade will be needed in order to accommodate the future growth in Kingborough. This upgrade will increase capacity from 4.1 Million Litres per Day to 8.5 Million Litres per Day.

The upgrade to the sewage plant will include construction to earth works, new roadways, new buildings and new tanks as well as equipment installation and commissioning. An Environmental Management Plan will be required before construction in order to evaluate site management, erosion control, air quality, flora and fauna, noise management, and traffic management.

Location: Kingborough, Tasmania

Our role: Introducing a wastewater treatment process called Intermittently Decanted Extended Aeration (IDEA) which is combined with Sequential Batch Reactor (SBR) technology in order to provide a cost efficient way of treating wastewater.

Infrastructure: Kingborough Sewerage System

Project Value: A$39M

Estimated completion date: 21 months to design and construct

Maintenance Period: 24 months of performance evaluation

General Information

  • Current treatment capacity: 4.1 Million Litres per Day
  • Increase of treatment capacity to: 8.5 Million Litres per Day
  • Construction of a new sewage pipeline to take waste from Margate, Electrona and Howden to the Blackmans Bay Sewage Treatment Plant
  • 21 months to design and construct