8,640m3/day

Tertiary treatment

Tertiary treatment, Micro filtration and Ancillary works for the Galindo WWTP

General Information

  • Entity: Bilbao - Bizkaia Water Consortium
  • Location: Galindo, Vizcaya, Spain
  • Flow: 8,640 m3/day

Key points

Technical data

  • Ph: 7.9
  • Conductivity: 3,061
  • S.S.T.: 59
  • S.S.V.: 46
  • DBO5: 17.20
  • D.Q.O.: 116
  • N-NH3: 5.14
  • N-NO3: 12.70
  • N-NO2: 0.69
  • P-PO4: 4.10

Treatment

  • Lifting Pumping Conventional Treatment
  • Pumping to Micro filtration
  • Flow Metering
  • Mixing Chamber
  • Flocculation Chamber
  • Coagulant Dosing
  • Polyelectrolyte Dosing
  • Lamellar Settler-Thickener
  • Excess sludge pumping
  • Sludge recirculation pumping
  • Open Filtration Over Sand/Silt Bed
  • Filter Washing Pumping
  • Filter Washing Air Filters
  • Filter Washing Dirty Water Tank
  • Washing Water Recovery Pumping
  • Filter Washing Water Tank
  • U.V. Disinfection
  • Treatment Line by Filtering Sieve and Micro filtration
  • Treated Water Pumping to Storage Tank and Pumping to Sundry Services
  • WWTP. Clarifying Settler Water Sieving
  • Replacing Water Pumping to Furnace No. 2 Turbine Condenser Cooling
  • Replacing Water Pumping to Furnace No. 1 Turbine Condenser Cooling
  • Replacing Water Pumping to Thermal Drying Condenser Cooling