14,000

Equivalent Population

Pre, secondary and sludge treatments

GENERAL INFORMATION

  • Project: Bakio Wastewater Treatment Plant
  • Entity: Town Hall of Bakio
  • Localisation: Bakio, Biscay, Spain
  • Design rate: 2,000 m3/day
  • Population: 2.000 Pop./equiv. in winter and 12,000 Pop./equiv. in summer

KEY POINTS

Pre-treatment:

Gross solids grid, gross solids grid and grit extractor-classifier

Secondary treatment:

Biological treatment of active sludge with recirculation of sludge and decantation

Sludge treatment:

Thickener and dehydration