5.50km
long
INDUSTRY, INNOVATION AND INFRASTRUCTURE
Build resilient infrastructure, promote sustainable industrialization and foster innovation
Economic growth, social advancement and action against the climate emergency depend largely on investment in infrastructure, sustainable industrial development and technological progress. Today, about 1 billion people live more than 2 km from a roadway, 940 million live without electricity, and 663 million lack improved drinking water sources.
ACCIONA participates in the entire infrastructure construction value chain, from the identification of opportunity, design and execution, to the operation and maintenance of the constructed works, using the most advanced and innovative techniques.
Performance quality and safety are two of the criteria that maximize the company's value proposal in the development of large infrastructure projects and that differentiate it from other competitors in the construction field.
Located in the state of Tabasco, the Villahermosa Bypass was completed in 24 months, and was executed in the sections spanning from kilometre 0+800 to kilometre 2+300 and from kilometre 10+000 to kilometre 14+000.
Different junctions were built, including Loma de Caballo, as well as the Reloj and Aguacero Bridges. The work helps to reduce traffic congestion in the urban area of the city of Villahermosa, diverting vehicle traffic, and connects the centre and the south of the country.
GENERAL INFORMATION
- Location: Villahermosa, Tabasco, Mexico.
- Contract type: Construction.
- Infrastructure: Construction of dirt roads, drainage works, structures, asphalt wearing course, ancillary works, and horizontal and vertical signage, in two separate 10.50-m wide units; includes the Loma de Caballo Junction, as well as the Reloj and Aguacero Bridges.
- Year of project completion: 2013