15.8km

long

total of 29 stations

This system connects the municipalities of Barcelona, Hospitalet and Baix Llobregat, and includes a total of 29 stations, with connections to Metro lines 3 and 5, and two other suburban train stations. The fleet consists of nineteen 32.5-m long carriages with a capacity for 230 passengers.

The project involves the design, construction of civil works, vehicles and systems, financing, operation and maintenance, as well as the provision of rolling stock. Payments are based on an availability mechanism until the project is turned back over in 2032.

General Information

  • Location: Barcelona, Spain
  • Contract type: Design, construction, financing, operation and maintenance, as well as the provision of rolling stock
  • Infrastructure: 15.8 km, 29 stations, mainly at grade, including the fare collection system. 19 32.5-m trains for 230 passengers
  • Year of project completion: 2008

Discover other ACCIONA projects

All of our projects