700,000

Equivalent Population

Developed as a brown field seawater desalination plant

United Arab EmiratesSee on Google Maps
Design and construction

This new Seawater Reverse (SWRO) Plant is being developed as a brown field seawater desalination plant and associated facilities, with the selected desalination technology being Sea Water Reverse Osmosis (SWRO), two (2) pass RO, including pre-treatment facilities.

This ACCIONA/Besix JV will be responsible of the interconnection and interface with the new 132/11kV substation within JAPS and the existing Central Control Room in Station K.

This Plant is expected to be commissioned by May 2020 to meet the reserve margin criterion set for peak water demand for the year 2020 and beyond

General Information

  • Location: Jebel Ali, Dubai. UAE
  • Capacity: 182,000 m3/d 
  • Procedure: Reverse Osmosis
  • Type of Contract: EPC 
  • Population: 700.000 

Discover other projects of ACCIONA