800,000

population supplied

Drinking water

Design, construction, start-up, operation and maintenance of the facility for a period of 25 years.

The plant will produce 120,000 m3/day of fresh water, from sea water through reverse osmosis. The catchment of sea water is carried out through the open intake system. The pre-treatment includes sand and cartridge filtration, as well as chemical dosages.

General Information

  • Project: Fouka SWRO
  • Entity: AEC / SNC–LAVALIN.
  • Location: Fouka, Algeria.
  • Population equivalent: 800,000 inhabitants
  • Capacity: 120,000 m3/day.

Discover other projects of ACCIONA

All of our projects