The new line has two general tracks with a distance between axes of 4.3 m and a platform width of 13.3 m. The project was completed in December 2008.
GENERAL INFORMATION
- Location: Seville - Cádiz, Spain.
- Contract type: Construction.
- Infrastructure: Two tracks with a distance between axes of 4.3 metres and a 13.3-m wide platform.
- Year of project completion: 2008