3.65km
single track
INDUSTRY, INNOVATION AND INFRASTRUCTURE
Build resilient infrastructure, promote sustainable industrialization and foster innovation
Economic growth, social advancement and action against the climate emergency depend largely on investment in infrastructure, sustainable industrial development and technological progress. Today, about 1 billion people live more than 2 km from a roadway, 940 million live without electricity, and 663 million lack improved drinking water sources.
ACCIONA participates in the entire infrastructure construction value chain, from the identification of opportunity, design and execution, to the operation and maintenance of the constructed works, using the most advanced and innovative techniques.
Performance quality and safety are two of the criteria that maximize the company's value proposal in the development of large infrastructure projects and that differentiate it from other competitors in the construction field.
SUSTAINABLE CITIES AND COMMUNITIES
Make cities and human settlements inclusive, safe, resilient and sustainable
Today, cities represent 3 % of the planet's surface and concentrate more than 50 % of the population. A figure that will rise to 70 % by 2050. In addition, cities generate more than 80 % of the world's gross domestic product (GDP).
In addition to facilitating access to essential services for life - such as energy and water - ACCIONA contributes to making cities places of productive well-being in which to live, favouring people's socio-economic development.
The high-speed rail line comprises of 3.65 km of single track and 5 km of double-track precast segmental viaducts. These were constructed with launching truss system and the balanced cantilever method. The system includes 3.7 km of double track at ground level, 8 elevated stations and 2 ground-level stations.
GENERAL INFORMATION
- Location: San Juan, Puerto Rico.
- Contract type: Design and construction.
- Infrastructure: 3.65 km of single track and 5 km of double-track precast segmental viaducts, 8 elevated stations and 2 ground-level stations.
- Year of project completion: 2004