The project involved the construction of a wharf with a length of 880 m, a depth of 17.50 m and a width of 16.75 m, using precast reinforced concrete caissons. In addition to the dredging of the foundations, the dredging operations included the inner harbour of the Port of Sagunto, approximately 5 million m3.
ACCIONA awarded this project one of the Annual Project Management Awards; these awards recognize excellence in different fields related to quality, occupational risk prevention, technology, etc.
GENERAL INFORMATION
- Location: Sagunto, Valencia, Spain.
- Contract type: Construction.
- Infrastructure: 880-m long, 17.50-m deep and 16.75-m wide, using reinforced precast concrete caissons.
- Year of project completion: 2011