We used necessary cookies for the website to function correctly, guaranteeing basic functionalities and the security of the website. In addition. Depending on your selection, we will use our own and third-party cookies to improve the functioning; preferences cookies, related to the type of browser or the region from which you access, and/or marketing cookies that allow us to analyze browsing habits. For further information, please consult our cookies policy.

You can accept all cookies, configure them or reject their use bellow.

Our foundation: acciona.org Initiatives we support Our strategy Sustainable Development Goals Social development Sustainability indices Sustainable Development Alliances Technology and innovation centres Open and collaborative innovation Digital hub Innovation projects Job offers Graduates and internships Opportunities and inclusion Safety, health and well-being Training Energy Transport Water Social Cities Real Estate Financial Integrated annual report Annual accounts Results, reports & presentations Average period of payment to suppliers Ratings Share price Dividends Analyst opinions Investor calendar General Shareholders' Meeting Board of Directors and Committees Management team Share capital Annual Corporate Governance Report Director remuneration Governance rules and compliance Framework Agreement CNMV Communications Sustainable finance

The Pajares tunnels are part of the Madrid - Asturias High Speed Line, and construction work on these tunnels was carried out between 2004 and 2009. This infrastructure crosses the Cantabrian mountain range from the municipality of Pola de Gordón (León) to Telledo (Asturias).

They are the second longest built in Spain, the sixth longest in Europe and the thirteenth longest in the world. The project was completed in March 2009.

The project consisted of the construction of twin tunnels 8.50 m in diameter and 10.67 km long, of which 7.67 km were excavated using TBMs and the remaining 3 km using conventional methods. The gradient of the tunnels is 1.685% downwards from León towards Asturias.

In addition, an intermediate access gallery of 2,045 m and 28 connecting galleries were constructed between the two tunnels with a total length of 1,262 m.

GENERAL INFORMATION

  • Location: León - Asturias, Spain.
  • Contract type: Construction.
  • Infrastructure: Construction of twin tunnels with a diameter of 8.5 m and a length of 10.67 km, of which 7.67 km were excavated using tunnel boring machines, and 3 km using conventional methods.
  • Year of project completion: 2009