1,064m

long

Fishing dock

This project consisted of the construction of a fishing dock formed by a 1,064-m long breakwater, in three alignments.

The inside breakwater, which contains a 6-m deep and 1,083-m long caisson quay; a 167-mlong external dike; 200 m of artificial beach between the outer sea wall and the 'Talleres Valiña Lavandeira' franchise, with a 20-m minimum width of dry beach; and the foundations (dredging and pavement) for the future Altura and Bajura jetties, both 6 m deep and 200 m and 150 m long respectively.

GENERAL INFORMATION

  • Location: A Coruña, Spain.
  • Contract type: Construction.
  • Infrastructure: 1,064 m-long breakwater , in three alignments; the internal alignment is made up of a 6-m deep and 1,083-m long caisson quay and a 167-m long outer sea wall, 200 m of artificial beach and the foundations for the future jetties.
  • Year of project completion: 1995