This project consisted of the construction of a mooring line approximately 320 m long, with a 16-m draft depth, running from the current ramp of the Bufadero Container Base, following an approximately parallel alignment with the current wharf of the eastern container terminal.

General Information

  • Location: Canary Islands, Spain
  • Contract type: Construction
  • Infrastructure: Mooring line approximately 320 m long, with a 16-m draft depth
  • Year of project completion: 2008