This project consisted of the construction of a mooring line approximately 320 m long, with a 16-m draft depth, running from the current ramp of the Bufadero Container Base, following an approximately parallel alignment with the current wharf of the eastern container terminal.
GENERAL INFORMATION
- Location: Canary Islands, Spain.
- Contract type: Construction.
- Infrastructure: Mooring line approximately 320 m long, with a 16-m draft depth.
- Year of project completion: 2008