150,000

tonnes of waste/year

We treat cleannly non-recyclable waste

Engineering, procurement, construction, commissioning and O&M of the Ness waste to energy plant in Scotland.

ACCIONA has signed the contract to build and operate an energy from waste plant in the East Tullos area of Aberdeen, in Scotland. Ness Energy project will have an installed capacity of 14 MW and it will be able to process 150,000 tons per year. The completion of the construction is planned for 2022.

 

ACCIONA will lead the project using its own in-house construction skills to build the plant, and it will rely on the expertise of Indaver for the operation of the plant for a 20 year period.

 

This energy from waste plant will take non-recyclable waste from Aberdeen City, Aberdeenshire, and Moray Councils and treat it cleanly and completely conforming to the latest strict European standards for emissions.

 

General information

  • Location: East Tullos area of Aberdeen, Scotland
  • Client: Aberdeen City Council
  • Capacity: 14 MW
  • Technology:Waste to energy

Key figures

  • 150,000 tonnes per year
  • 14 MW of production capacity