Construction, maintenance and concession until 2042 of the Autovía de la Plata A-66 motorway A-66 between Benavente and Zamora measuring 49.05 km long.

The section type has 2 platforms separated by a central reservation of 10.00 metres, with 7.00 m wide carriageways and two lanes measuring 3.50 m each, 1 m inner hard shoulders and 2.50 m outer hard shoulders, with 1.10 m wide shoulders.

The project is divided into three sections:

  • A-6 (Castrogonzalo) - Santovenia del Esla

This section is 14.39 km long and the following elements are worth noting: a viaduct over the Arroyo de Prado Ramiro of 145 m long, 16 level crossings and three junctions

  • Santovenia del Esla - Fontanillas de Castro

This section is 17.76 km long and the following elements stand out: 5 level crossings, a service area, half-way through the section, with its corresponding slip roads and three junctions

  • Fontanillas de Castro - Zamora

This section is 16.90 km long and the following elements are worth noting: the viaduct over the Ricobayo dam, 240 m long, 5 level crossings, one service area and two junctions.

General Information

Location
Castilla y León, Spain
Contract type
Construction, maintenance and concession until 2042
Infrastructure
Dual carriageway measuring 49.05 km between Benavente and Zamora.
Year of project completion
2015