470km

double track

Designed for 300 km/h operating speed

Designed for 300 km/h operating speed and featuring the most advanced safety and communication systems at the time of commissioning. This project featured over 470 km of dual standard gauge track for freight and passenger lines.

ACCIONA executed 160 km of dual track, including two 1.2-km long incrementally launched viaducts. 

GENERAL INFORMATION

  • Location: Madrid - Seville, Spain.
  • Contract type: Construction.
  • Infrastructure: 160 km of dual track including two 1.2-km long incrementally launched viaducts.
  • Year of project completion: 1992

Discover other projects

All of our projects