75km

long

From Consuegra to Tomelloso

ACCIONA took part in the concession for the design, construction, financing and operation of the highway. It was built in two separate sections: the first from Consuegra to Alcázar de San Juan, with a new 43-km route, and the second from Alcázar de San Juan to the north of Tomelloso, with a length of 22 km.

The project included 14 junctions that provide access to places such as Consuegra, Madridejos, Camuñas, Villafranca de los Caballeros, Herencia, Alcázar de San Juan and Tomelloso.

ACCIONA participated in the concession for the design, construction, financing and operation of the highway. It was built in two distinguished sections; the first one from Consuegra to Alcázar de San Juan, with a new route of 43 km, and the second from Alcázar de San Juan to the north of Tomelloso, with a length of 22 km.

The project included 14 junctions that allow access to places such as Consuegra, Madridejos, Camuñas, Villafranca de los Caballeros, Herencia, Alcázar de San Juan and Tomelloso.

The highway won the Deal of the year 2004 award, granted by Euromoney Project Finance.

General Information

  • Location: Consuegra-Tomelloso
  • Contract type: Design, construction, financing, operation and maintenance (PPP)
  • Infrastructure: Highway built in two sections, including 14 junctions
  • Year of project completion: 2006