Our foundation: acciona.org Initiatives we support Our strategy Sustainable Development Goals Climate emergency Social development Sustainability indices Sustainable Development Alliances Technology and innovation centres Open and collaborative innovation Digital hub Innovation projects Job offers Graduates and internships Diversity, equity and inclusion Safety, health and well-being Training Selection process Energy Transport Water Social Cities Real Estate Financial Integrated annual reports Annual accounts Results, reports & presentations Average period of payment to suppliers Ratings Share price Dividends Analyst opinions Investor calendar General Shareholders' Meeting Board of Directors and Committees Management team Share capital Annual Corporate Governance Report Director remuneration Governance rules and compliance Framework Agreement CNMV Communications Sustainable finance
Railway in Gijon Asturias, Spain See on Google Maps
Nine ventilation shafts and emergency exits were designed. The railway tunnel was excavated with tunnel boring machines. Cladding is with precast concrete voussoirs. The stations are built with reinforced concrete cut-off walls.

The new infrastructure consists of the excavation of a double-track tunnel by means of an earth pressure shield with a free diameter of 9.60 m, and 0.32 cm precast voussoirs. A 60 kg/m track with a width of 1,668 mm and a distance between axes of 3.82 m embedded in an elastomeric matrix will be mounted on a concrete slab. On the sides of the track, there are several longitudinal 1-m paths under which the pipelines run.

The project included the construction of 8 ventilation shafts along the length of the tunnel, plus emergency exits, 2 of which will also house pumping wells and one ventilation shaft. The project includes the construction of 3 stations along the line, each with 165-m long platforms. Begoña Station was built using mining methods, whereas the stations of El Bibio and Viesques were built using a cut-and-cover method.

The electrification and the signalling and communications installations were not included in the project. The project also did not cover any tunnel ventilation or lighting components, cladding, finishing, or building installation.

GENERAL INFORMATION

  • Location: Gijón, Spain.
  • Contract type: Construction.
  • Infrastructure: 3.91-km long tunnel with a diameter of 10.60 m. 3 new stations.
  • Year of project completion: 2006