138,000

Inhabitants served

Upgrading the current distribution system

Dominican Republic See on Google Maps
The plant provides drinking water to 138,000 people, a number that can be increased to 300,000 people in the future.

In addition to the DWTP and the supply main, ACCIONA built several raw water pipelines, a pressure piping line, six new regulating tanks and a pumping station.

The entire supply system was upgraded, which entails developing a large drinking water supply network for the towns of Bani, Paya, El Fundo, Matanzas and Arroyo Hondo.

General Information

  • Location: Peravia, Dominican Republic 
  • Capacity: 86,400 m3/d 
  • Contract type: D&C
  • Equivalent population: 138,000 people