The construction for the Government of the State of Campeche started in July 2009 and lasted 19 months, and contributes to the modernisation of the country's roads.
The construction has a total length of 837 m. The bridges make up a total of four structures, with lengths of 195 m, 111 m, 167 m and 364 m, respectively.
GENERAL INFORMATION
- Location: Campeche, Mexico.
- Contract type: Construction.
- Infrastructure: Construction of four bridges. The lengths are, respectively, 195 m, 111 m, 167 m and 364 m.
- Year of project completion: 2011