36,000

equivalent households

With the most powerful wind turbines

Featuring 10 Nordex wind turbines with 4.8MW rated capacity, the new wind farm was commissioned in 2022.

ACCIONA Energía has comissioned the Celada Fusión wind farm (48MW) in the Valles del Cerrato region, in Palencia (Spain). With an investment of more than €45M, the wind farm started operations in the first half of 2022.

The wind farm includes 10 Nordex 149 wind turbines that will be installed atop 125-meter-high steel towers. The turbines, among the most powerful units developed for onshore wind power, are the first of this series to be installed in Spain.

The Celada Fusión project is located in the Spanish municipalities of Baltanás, Herrera de Valdecañas and Hornillos de Cerrato (Palencia). This new facility is within close proximity to the Celada I and V wind farms (34MW and 26MW, respectively) which ACCIONA Energía also operates in the region. Given this proximity to the other wind farms, the company is able to use most of the access and interconnection infrastructure that were developed previously in the area.

Annual production at Celada Fusión is estimated at 136,000MWh per year of clean electricity, which will contribute to the decarbonization of the Spanish electricity mix and will avoid the emission of 60,000 tons of CO2 per year. The wind farm will offset the energy used for its construction (including the manufacture of all equipment, extraction of raw materials, etc.) in less than nine months.

 

GENERAL INFORMATION

  • Location: Baltanás, Herrera de Valdecañas and Hornillos de Cerrato (Palencia, Spain)
  • Total capacity: 48 MW
  • Wind turbines: 10 Nordex N149/4.8
  • Tower: steel, 125m hub hight.
  • Start up: 2022
  • Owner: ACCIONA Energía

key points

  • Total investment of more than 45 million euros.
  • Annual production of 136GWh, enough to meet the demand of 36,000 households.
  • Some 60,000 tons of CO2 avoided annually.
  • Wind turbines among the most powerful developed for onshore wind, assemblied in Spain.
  • Most of the access and interconnection infrastructure had already been installed for two existing wind farms.
  • Social and environmental impact management.

Experience | ACCIONA

How a wind farm is born

Join the tour and discover step by step how a wind farm is built. Check out the video and picture gallery full of fascinating revelations about such a project, in this case Celada Fusion wind farm, helping us move the world without harming the planet.

Reusing biomass ashes for roads

Parallel to the construction works of the wind farm, ACCIONA Energía will implement environmental and social improvement initiatives, as it does with all its renewable projects.

As part of its social impact management, the company is conducting social studies to determine the upcoming measures it will launch to help spur development in the wind farm’s surrounding communities.

ACCIONA Energía has adjusted the precise location of the farm’s wind turbines in order to protect the wildlife and ecosystem around the facility, as well as to preserve the area’s cultural and archaeological heritage, while reducing any visual impact to the landscape. The project contemplates environmental measures aimed mainly at reforestation and initiatives to encourage nesting and reproduction of fauna species.

The construction of the accesses leading to the facility is being executed by a pilot project that substitutes quarry materials with ashes from ACCIONA Energía's biomass plant in Briviesca. The reuse of biomass ashes allows the company to recycle its waste, promote circular economy and reduce CO2 emissions generated from the construction process. The waste reuse rate registered for the company exceeds 93% worldwide and stands at 96.5% in its operations in Spain.

Key figures

48

megawatts (MW) total capacity

36,000

equivalent homes production

10

Wind turbines

60,000

tons of C02 avoided a year

45

million euros total investment

125

meters hub height