We used necessary cookies for the website to function correctly, guaranteeing basic functionalities and the security of the website. In addition. Depending on your selection, we will use our own and third-party cookies to improve the functioning; preferences cookies, related to the type of browser or the region from which you access, and/or marketing cookies that allow us to analyze browsing habits. For further information, please consult our cookies policyopens in a new tab.

You can accept all cookies, configure them or reject their use bellow.

Our foundation: acciona.org Initiatives we support Our strategy Sustainable Development Goals Social development Sustainability indices Sustainable Development Alliances Technology and innovation centres Open and collaborative innovation Digital hub Innovation projects Job offers Graduates and internships Opportunities and inclusion Safety, health and well-being Training Energy Transport Water Social Cities Real Estate Financial Integrated annual report Annual accounts Results, reports & presentations Average period of payment to suppliers Ratings Share price Dividends Analyst opinions Investor calendar General Shareholders' Meeting Board of Directors and Committees Management team Share capital Annual Corporate Governance Report Director remuneration Governance rules and compliance Framework Agreement CNMV Communications Sustainable finance

Along its full length of 85 km, the canal constitutes the backbone of the works that make up the Segarra - Garrigues System, the aim of which is to transform 75,000 ha in the province of Lleida into irrigable land.

The initial stage of the project includes the construction of the canal over the last 22.27 km, including all of the necessary hydraulic works for the proper control of the canal. In addition, two intakes were designed for two irrigation sectors: 8 and 9. This project does not include a study of the conveyance system necessary for the irrigation reservoirs. 

In the initial phase of the project, the owner reported the need to include the construction of a new intake in the project plan.

  • 13.3 km were built with a trapezoidal cross-section, with a bottom width of 3.00 m and a top width of 12.60 m, and lined with 15-cm thick HM-25 concrete with polypropylene fibre.
  • 5.3 km of tunnel construction: the 300-m long Serranía Tunnel was excavated using conventional methods (the New Austrian Method) and the 4,990-m long Bessons Tunnel was excavated with an open shield tunnel boring machine. Both tunnels were lined using a trolley.
  • 2 km bottom-poured (executed with a double concrete pipe with metal covering, with an internal diameter of 2,400 mm).
  • 1.7 km distributed across 3 aqueducts (1 of them to cross over the AP-2 Highway).

GENERAL INFORMATION

  • Location: Lleida, Spain.
  • Contract type: Construction.
  • Infrastructure: 13.3 km were constructed as a trapezoidal canal, 3.00 metres wide at the base and 12.60 metres at the crown, a tunnel with a diameter of 4.1 m and a length of 5.3 km, 2 km bottom poured, and 1.7 km distributed across 3 aqueducts.
  • Year of project completion: 2012