The project's features include the construction of the subway station caverns using lateral galleries, pile-driving operations used on a non-circular section, the construction of the station accesses using the traditional method of ramps in sections of up to 70 m, and a number of shafts of up to 60 m deep and 16 m in diameter in an urban area.

In addition, the interior installations and architecture were carried out simultaneously in three stations, along with their corresponding access points.  

General Information

Location
Barcelona, Spain
Contract type
Construction
Infrastructure
1.4-km long tunnel and a new station, including the interior installations for three stations, as well as their corresponding access points
Year of project completion
2010