ANA (IBEX 35) +93,3000 (0,48 %)

What are you searching?

    Hong Kong

    ACCIONA is present in the country through its Construction division

    ACCIONA began operations in China in 1993. During that year, it took part in the construction of the large bridge of Ting Kau, one of the longest cable-stayed bridges in the world, which it completed in 1998. Since then, it has carried out other major works, such as the stations of Kowloon and Kam Sheung Road, the Lai Chi Kok viaduct and various infrastructures for the KCRC railway line.


    Projects

    Ting Kau Bridge

    Ting Kau Bridge

    Ting Kau Bridge is the world’s first major twin main span cable-stayed bridge. The design of this bridge contains unique features such as single leg towers stabilized by transverse cables, just like the masts of a sailboat and full span stay cables between towers. The Ting Kau Bridge is not just a significant landmark—it also carries the heaviest traffic volume of the bridges supporting traffic to and from mainland China and the Hong Kong container port.

    Kowloon Interchange

    Kowloon Interchange

    The work was completed in 1998 includes the Airport Express Line (AEL), the Lantau Line (LAL), the public transport hub and associated future East Kowloon Line (EKL). All platforms are underground and separated vertically. The station also serves as a support base for future developments.

     

    Ma On Shan Line

    Ma On Shan Line

    All stations are pile-supported elevated structures. The construction included foundations, reinforced concrete works, structural and architectural sidewalks, footbridges, links to the existing subway, new subways, elevated walkway systems, E&M signalling installation and architectural finishing works. 

    Lai Chi Kok Viaduct

    Lai Chi Kok Viaduct

    The Lai Chi Kok Viaduct (LCKV) is part of the new Route 8 that links Chep Lap Kok International Airport with Shatin Area. It measures 1.4 kilometres of lenght and it has four acces and exit points. With the aim of contributing to sustainable development through the use of environmentally friendly techniques, ACCIONA used recycled concrete during landfill work


    Representative

    Cliff Stone

    Development Director, Agua

    cliff.stone@acciona.com
    +61 419 923 976 / +61 7 3087 4333
    Level 5, 88 Creek Street, Brisbane QLD 4000

    Move up

    YOU'RE JUST ONE STEP AWAY!

    Please, confirm your subscription on the email we have sent you and your registration will be completed.

    YOU'VE ONLY GOT ONE STEP LEFT!

    Please confirm your subscription in the email we just sent you to complete the registration and you will be able to download your ebook.

    YOU ARE ALREADY SUBSCRIBED TO THE NEWSLETTER!

    If you've missed our content, try checking your junk mailbox and
    add us to your address book so you can enjoy them without any problem.

    An error has occurred.

    Your email has been unsubscribed. You will not receive more newsletters, unless you subscribe again. Thank you very much